Tower · layout 1 · gpt-6-astra · sensor-only

B601 · Zoetic harness 0.4.51 · 14 rounds · 30 requests · 2.23M input tokens · 9 min model time · 40 min wall clock

Not metRoboDojo graded score 0Not within RoboDojo’s step limitModel declared the task finishedGPU physics

“Build a tower using the wooden blocks and wooden boards.”

The task. Build a tower from wooden blocks and boards.

What the model had. Color and depth images from the three cameras, the camera calibration and the robot’s own readings, as on a real robot. Its opening note only pointed to where spatial information can be found.

Host’s offline check. The order and orientation of the blocks in the tower were not met. The task run ended at control step 2,019; RoboDojo’s limit for this task is 1,050. The model never saw this check.

The last two rounds. The model lifted the last block, placed it, withdrew the right arm, waited 40 control steps and reported the tower built.

Head camera
Left wrist
Right wrist
  • Moved an object
  • Moved the arm only
  • Failed or stopped
  • Width = seconds of simulated motion. “Moved” means an object shifted at least 5 mm. Select a segment to jump to it.

Model Report, Round by Round

As the model wrote them: its judgment, its target for the round, its check of the previous step, and its next step. Names such as place_and_release, scene_read and run_program are harness tools it could call; tools indented under run_program ran inside one of its programs. Round numbers start at 0.

  1. Round 0align_plan

    Use the long board as the base, then add paired block supports and the shorter board.

    Target: Nearer left block

    Previous step: none

    Next: Request a left-arm approach plan above the nearer left block.

  2. Round 1run_programmove_posemove_tograsp_and_verifyobserve

    A vertical grasp across the first block is feasible; proceed with a staged descent and measured lift.

    Target: Nearer left block

    Previous step: met: align_plan for obs-51f47424c2854ad0 supplied admitted poses; design geometry supplied finger-end extent.

    Next: Approach, descend beside the block, close, lift, and capture fresh images; stop if a move fails.

    Moved: block1

  3. Round 2place_and_releaseobserve

    The visual and encoder evidence support a successful grasp. Place the block on the base board.

    Target: Left support position on long board

    Previous step: met: program 17ca18420889 and obs-a3b397433e5a4bfc show holding and a lifted block.

    Next: Carry to the left support location, lower onto the board, release, and retreat.

    Moved: block1

  4. Round 3run_programrotate_wristplace_and_releaseobserve

    The block remains held; change wrist orientation to recover travel range before retrying.

    Target: Held first support block

    Previous step: not_met: action-02ef3bed40a848118ce21eda703f7590 did not reach the board and gripper_opened=false.

    Next: Turn the left wrist +90 degrees, then retry placement if the turn succeeds.

    Moved: block1

  5. Round 4run_programrecover_posemove_posemove_tograsp_and_verifyplace_and_releaseobserve

    The first support is placed. Add the matching support on the right side of the base.

    Target: Nearer right block and right base support

    Previous step: met: program 6e0500000679 reports opened and retreated; obs-93de4e414faa4b49 shows the block on the board.

    Next: Park the left arm, grasp the nearer right block, and place it on the base if the measured grasp holds.

    Moved: block2

  6. Round 5run_programrecover_posemove_posemove_tograsp_and_verifyobserve

    Both support tops are approximately level at z=0.8232 m, suitable for the shorter board.

    Target: Shorter wooden board

    Previous step: met: da270e2b2d87 and obs-f74f34a2f0264513 show both supports on the base with matching top heights.

    Next: Park the right arm and grasp the shorter board across its narrow dimension.

    Moved: block7

  7. Round 6place_and_releaseobserve

    The board is held nearly level and can bridge the two supports.

    Target: Shorter board over paired supports

    Previous step: met: e58de7a23912 and obs-e8d19ebd73b44098 show the lifted board and undisturbed supports.

    Next: Place the shorter board across the supports and retreat.

    Moved: block7

  8. Round 7run_programmove_posemove_tograsp_and_verifyplace_and_releaseobserve

    The upper board is level near z=0.8431 m. Add two closer-spaced supports for the small top board.

    Target: Left upper support block

    Previous step: met: action-45392392fe174719b5e4e2e8194956f2, action-8ccb484fd31740debc973e7e7e99dc10, and obs-b30098edf8274027.

    Next: Grasp the remaining left block and place it near x=-0.035 m on the upper board.

    Moved: block5

  9. Round 8run_programrecover_posemove_posemove_tograsp_and_verifyplace_and_releaserecover_poseobserve

    The left upper support is placed; add its partner.

    Target: Right upper support block

    Previous step: met: aa5352456bf1 and obs-f385c754b48b4ee6 show the upper block released on the board.

    Next: Park the left arm, grasp the remaining right block, and place it on the upper board.

    Moved: block6

  10. Round 9run_programmove_posemove_tograsp_and_verifycarry_torotate_wristobserve

    Upper support tops match at z≈0.8809 m. The small wooden board can span their roughly 74 mm center spacing when turned crosswise.

    Target: Small wooden top board

    Previous step: met: 2d4c33fb227b and obs-001a685344a74144 show both supports upright and the tower intact.

    Next: Grasp the small wooden board, lift, raise for clearance, and turn it 90 degrees.

    Moved: block3

  11. Round 10run_programplace_and_releaserecover_posewait_ticksobserve

    The top board is held crosswise and ready for centered placement.

    Target: Small top board

    Previous step: met: c0b5e7162889 and obs-36e2bcc23bda46e8 show the held crosswise board.

    Next: Place the small board across the upper pair, then park the arm and allow settling.

    Moved: block3

  12. Round 11run_programmove_posemove_tograsp_and_verifycarry_toobserve

    The tower is stable so far. The green piece is a triangular prism suitable as a centered top piece.

    Target: Green triangular top piece

    Previous step: met: 4e044e800586 and obs-f7a2f45a07a5479b show the top board supported and the tower intact.

    Next: Grasp the prism across its parallel end faces, lift it, and raise it above tower height.

    Moved: block4

  13. Round 12run_programplace_and_releaserecover_posewait_tickswait_ticksobserve

    The green prism is held clear of the tower and can be placed centrally.

    Target: Green top piece on tower

    Previous step: met: 75253276da53 and obs-c96953054c1e40c7 show the prism lifted clear with its lower edges approximately level.

    Next: Place the prism on the top board, park the right arm, and advance settling time.

    Moved: block4

  14. Round 13finish_episode

    Tower completed using all eight pieces.

    Target: Completed tower

    Previous step: met: c72b877ae7c1 and obs-6300e95aacdd4a39 show the complete tower standing after settling.

    Next: Finish the episode.